Spreyton, TAS

Veolia MRF

Veolia MRF

Veolia MRF

Industrial Electrical
Mechanical Fitting
6 Months
>$850,000

Overview

Overview

Overview

The industrial electrical installation at the Veolia Materials Recovery Facility (MRF) in Spreyton, Tasmania, was a complex and dynamic project aimed at upgrading and modernising the electrical infrastructure to support the efficient processing of recyclable materials. The project spanned over a 5.5-month period and involved a skilled team of up to 13 electrical technicians working in close coordination with mechanical and Veolia operational team.


Approach

Approach

Approach

The scope of work included the design, installation, and commissioning of the electrical systems necessary to power and control equipment within the MRF. This facility is a key part of Veolia's waste management and recycling operations, processing large volumes of waste materials for recycling. The electrical infrastructure was essential to ensure reliable and safe operation of heavy-duty machinery, conveyors, sorting equipment, and other automated systems.


Impact

Impact

Impact

By the end of the 5.5-month period, the electrical systems at the Veolia MRF were successfully installed, tested, and commissioned, allowing for the seamless operation of the facility’s recycling operations. The upgraded electrical infrastructure supported the increased capacity of the facility, ensuring the plant could meet growing demand while maintaining energy efficiency, safety, and compliance with environmental standards.


The installation was completed on time and within budget, providing Veolia with a state-of-the-art electrical system that would support the long-term sustainability and growth of the Spreyton MRF. The project’s success was a direct result of the skilled and coordinated efforts of the team, as well as the close collaboration between all stakeholders involved.